Jump to content

Horrible road works = Bumpy roads


Sunnycrowe
 Share

Recommended Posts

 

like an infection illness, the bump somehow spread to Lane 2. so beware of it

Yeap

Was keeping in lane 2 and realised it has crossed over liao...

↡ Advertisement
Link to post
Share on other sites

Yeap

Was keeping in lane 2 and realised it has crossed over liao...

boss, let's complain to LTA, you do 1, i do 1. most sound will move their lazy ass to work....

 

now the leftmost lane also got slight bump....

  • Praise 1
Link to post
Share on other sites

Everyday when I drive and tio the bump, will curse and swear @ LTA.

 

Pay road tax but give me this type of road to drive??

  • Praise 2
Link to post
Share on other sites

3rd Gear

the cte-aye havelock speed bump has spread towards the cte-sle side if you had noticed. avoid lane 1.

Link to post
Share on other sites

Supersonic

Theres 1 awful pothole around Great Eastern Centre. 2nd lane from the right. I kana 3 times. Finally remembered to siam that lane last evening. Bit when I peak at it, seems patched.

  • Praise 1
Link to post
Share on other sites

cte-aye havelock speedbump has been repaved.

 

I'm impressed by their efficiency. not sure if that is due to my feedback or they already have many similar feedbacks before they move their ass to work. haha

 

But anyway great effort by LTA to respond quickly.

 

Our Ref: LTA/TRO/RME/RAM/F20.000.000/35134

Date : 7-Jul-2014

Tel : 6396 2062

Fax : 63961140

 

 

 

Dear Mr Tan

 

*EXP: Huge Bump at lane 1 and 2 - CTE tunnel (near Havelock Road exit)

FEEDBACK NUMBER: 20140703-1060

 

We refer to your email of 3 July 2014.

 

We have rectified the mentioned road pavement on 4 July 2014.

 

We thank you for writing in.

  • Praise 1
Link to post
Share on other sites

Try upper jurong road the stretch between pioneer rd north and jurong west st 93. It's like a farking war zone on the extreme right lane

Link to post
Share on other sites

Neutral Newbie

 

I'm impressed by their efficiency. not sure if that is due to my feedback or they already have many similar feedbacks before they move their ass to work. haha

 

But anyway great effort by LTA to respond quickly.

 

Our Ref: LTA/TRO/RME/RAM/F20.000.000/35134

Date : 7-Jul-2014

Tel : 6396 2062

Fax : 63961140

 

 

 

Dear Mr Tan

 

*EXP: Huge Bump at lane 1 and 2 - CTE tunnel (near Havelock Road exit)

FEEDBACK NUMBER: 20140703-1060

 

We refer to your email of 3 July 2014.

 

We have rectified the mentioned road pavement on 4 July 2014.

 

We thank you for writing in.

 

I wrote in to feedback regarding two stretch of roads due to poor patching and condition as well.

After 1 week, both places I see repair works done. Pressumed that many have complained too.

However I did not receive any reply, only reply I had was an automated reply to acknowledge receiving my email.

Link to post
Share on other sites

many roads lack maintenance.

 

on my way to lck cemetery the hearse was bouncing up and down.

 

and the nails on my coffin loosened.

Link to post
Share on other sites

many roads lack maintenance.

 

on my way to lck cemetery the hearse was bouncing up and down.

 

and the nails on my coffin loosened.

OMG!  :slow:

Link to post
Share on other sites

many roads lack maintenance.

 

on my way to lck cemetery the hearse was bouncing up and down.

 

and the nails on my coffin loosened.

 

Then what happen?  [laugh]

Link to post
Share on other sites

driving on nshw will tell you its less bumpy than our xpressway.

 

and i believe its the tree planted in the center divider that made it so with their roots growing wider and further.

Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
 Share

×
×
  • Create New...