I wrote to LTA regarding the poor, patchy resurfacing. After about 3 weeks, here's the reply (among others):

 

" Bukit Batok East Avenue 3

SPPG is carrying out cable-installation work at this area since early December 2013, and would need time to test the cables after they have been laid. We target to complete these testing in September 2014 and then commence resurfacing work on the road. "

A 300m cabling work that takes almost 1 year! Amazing! And even more amazing it will take 9 months to "test" the electrical cables. Any primary student will know cables are either close circuit, open circuit, or shorted.... within 30 minutes. Meanwhile thousands of motorists will have to suffer like drivers in India or Bolivia.

Most amazing of all, LTA can accept a patchy stretch of road for such a long duration waiting for Power Grid's "test" results.

No wonder the whole country's infrastructure is going downhill - no pride in their work, accepting third class performance. In Taiwan their road engineers have to clear land slides within a day or two. Imagine them saying "we will test the repair work for the next 9 months before opening the road"....

It indeed the patch road surface and lengthy road works indicate a systemic

problem in the organization.

We motorists in sgp pay the highest road tax, and road use charges ie erp and the things called COE, ARF in the world. And this is what we get?!!! ---- patchy, bumpy roads and long delays in road diggings!!! Edited by Super7
↡ Advertisement
Link to post
Share on other sites

 

I wrote to LTA regarding the poor, patchy resurfacing. After about 3 weeks, here's the reply (among others):

 

" Bukit Batok East Avenue 3

SPPG is carrying out cable-installation work at this area since early December 2013, and would need time to test the cables after they have been laid. We target to complete these testing in September 2014 and then commence resurfacing work on the road. "

A 300m cabling work that takes almost 1 year! Amazing! And even more amazing it will take 9 months to "test" the electrical cables. Any primary student will know cables are either close circuit, open circuit, or shorted.... within 30 minutes. Meanwhile thousands of motorists will have to suffer like drivers in India or Bolivia.

Most amazing of all, LTA can accept a patchy stretch of road for such a long duration waiting for Power Grid's "test" results.

No wonder the whole country's infrastructure is going downhill - no pride in their work, accepting third class performance. In Taiwan their road engineers have to clear land slides within a day or two. Imagine them saying "we will test the repair work for the next 9 months before opening the road"....

It indeed the patch road surface and lengthy road works indicate a systemic problem in the organization.

I believe LTA couldnt bother on the poor condition of the road cos those people in LTA doesnt use that particular road at all. Their job is only sit at the office replying standard replies, and tell you 'nothing much' can be done except continue monitoring the situation and may take action when necessary.

Edited by 13177
  • Praise 1
Link to post
Share on other sites

We motorists in sgp pay the highest road tax, and road use charges ie erp and the things called COE, ARF in the world. And this is what we get?!!! ---- patchy, bumpy roads and long delays in road diggings!!!

 

Super 7, you hit the spot. It's not about complaining but after paying all these, the roads are getting worse. In reality, most roads are under works now. Hope authority can divert more funds to do a good patch.

Link to post
Share on other sites

A 300m road work takes longer than conceiving a baby till it is born!

 

And notice the reply that it is only a "target" assuming not further "tests" or delays.

Link to post
Share on other sites

 

Super 7, you hit the spot. It's not about complaining but after paying all these, the roads are getting worse. In reality, most roads are under works now. Hope authority can divert more funds to do a good patch.

I think sometimes road works is unavoidable, but i am more concern on the patching quality they have done after the road works. Seems like nowadays they just anyhow patch back the hole, and make the road so bumpy and uneven.

Edited by 13177
Link to post
Share on other sites

I think sometimes road works is unavoidable, but i am more concern on the patching quality they have done after the road works. Seems like nowadays they just anyhow patch back the hole, and make the road so bumpy and uneven.

 

Yes, from the day i started driving roadwork is a necessity and we have been living with the inconvenience it brings but the quality of the patch-ups was always acceptable, unlike what we see today. Has the current LTA inspectors been sleeping on the job and pass / accept such bad patch-ups?

 

Note - LTA (or PS, Singtel, etc) pay the contractor to do the patch up after the diggings etc and has its own inspectors to inspect the patch ups before accepting/rejecting them.

Link to post
Share on other sites

 

Yes, from the day i started driving roadwork is a necessity and we have been living with the inconvenience it brings but the quality of the patch-ups was always acceptable, unlike what we see today. Has the current LTA inspectors been sleeping on the job and pass / accept such bad patch-ups?

 

Note - LTA (or PS, Singtel, etc) pay the contractor to do the patch up after the diggings etc and has its own inspectors to inspect the patch ups before accepting/rejecting them.

Could be the tolerant level for accepting the patching job has raised. Now even the road is bumpy, they think it is within their acceptable range.

Link to post
Share on other sites

bumpy roads can cause riders to skid and die

Could be the tolerant level for accepting the patching job has raised. Now even the road is bumpy, they think it is within their acceptable range.

 

Link to post
Share on other sites

Could be the tolerant level for accepting the patching job has raised. Now even the road is bumpy, they think it is within their acceptable range.

 

maybe many of them got fat backsides, cant feel the bumps through their car seats!! [sweatdrop]

Link to post
Share on other sites

 

maybe many of them got fat backsides, cant feel the bumps through their car seats!! [sweatdrop]

Either they have a fat backside or they are driving some high end cars which suspension damn good, and they dont feel anything on the road?!

 

Nowadays driving on the road feel like driving through series of speed strip or humps!

Link to post
Share on other sites

 

Yes, from the day i started driving roadwork is a necessity and we have been living with the inconvenience it brings but the quality of the patch-ups was always acceptable, unlike what we see today. Has the current LTA inspectors been sleeping on the job and pass / accept such bad patch-ups?

 

Note - LTA (or PS, Singtel, etc) pay the contractor to do the patch up after the diggings etc and has its own inspectors to inspect the patch ups before accepting/rejecting them.

 

They trying to test your car's suspension or shock absorbers aka dampers.

 

If suspension cannot tahan, then owner can go back to agent and bang table to claim warranty (that is if car is still under warranty).

  • Praise 1
Link to post
Share on other sites

 

They trying to test your car's suspension or shock absorbers aka dampers.

 

If suspension cannot tahan, then owner can go back to agent and bang table to claim warranty (that is if car is still under warranty).

Maybe the agent's own suspensions also spoilt by these bumps!!!!

Link to post
Share on other sites

I believe LTA couldnt bother on the poor condition of the road cos those people in LTA doesnt use that particular road at all. Their job is only sit at the office replying standard replies, and tell you 'nothing much' can be done except continue monitoring the situation and may take action when necessary.

 

you have to ask tuck you to travel that road everyday.

  • Praise 1
Link to post
Share on other sites

really dissappointed with the road condition in spore for the past 2 years till today

the whole singapore is under contruction ... road-after-road is patched up sibei lousy

very unsightly and very bumpy ... even orchard road (near centrepoint) the patch up is sibei lousy and worst condition

Edited by Wt_know
Link to post
Share on other sites

 

Actually standard comfort tyres are good enough for low speed, stop-go traffic in SGP also.

actually comfort tyres also not good enough if the road patch up is more like a mini hump.

  • Praise 1
Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
 Share

×
×
  • Create New...