10 hours ago, Wt_know said:

walao eh ... so bolehland did ask for another 6 months EXTENSION

how come bolehland MOT ... yaya papaya said ...

never submit “request” for further delay when question by journalist

 

I'm guessing their MOT's favourite movie is this...?

Screenshot_20191105-195643_Google.jpg

↡ Advertisement
Link to post
Share on other sites

Hypersonic

JB-Singapore RTS Link project suspended for another 3 months until Jul 31 amid COVID-19 outbreak

Quote

SINGAPORE: The suspension of the Rapid Transit System (RTS) Link project has been extended by another three months until the end of July, Singapore’s Ministry of Transport (MOT) said on Saturday (May 2).

Singapore COVID-19 "circuit breaker" measures and Malaysia's movement control order have "affected the pace of our discussions", said the ministry. 

“Like Malaysia, we are optimistic that the discussions on the outstanding matters can be concluded within three months, using tele-conferencing and other means of communication,” it added.

Malaysia’s Transport Minister Wee Ka Siong had said earlier on Saturday that bilateral discussions with Singapore on the project have been impacted by measures to stem the spread of the coronavirus on both sides of the Causeway.

He added that he has discussed the status of the bilateral agreement "closely and constantly" with his Singapore counterpart Khaw Boon Wan.

This is the third extension of the suspension at Malaysia's request.

https://www.channelnewsasia.com/news/singapore/jb-singapore-rts-link-project-suspension-july-covid-19-12696556

hmmm .... let's see what happens come July 31.

Link to post
Share on other sites

Supersonic
1 minute ago, Soya said:

Maybe by then, change gahmen again

teleport probably ready before RTS is up ... muahahahaha

  • Haha! 4
Link to post
Share on other sites

Supersonic
1 hour ago, Wt_know said:

teleport probably ready before RTS is up ... muahahahaha

Or lagi better.....SG qualify for World Cup b4 RTS is up

 

  • Haha! 2
Link to post
Share on other sites

29 minutes ago, Soya said:

The contract was signed during Ah Jib kor time le.

Whoever break it also need to pay.

LLST lo

Link to post
Share on other sites

1 hour ago, Soya said:

er, our side who will sign hah ? [:p]

MOT.PNG

Link to post
Share on other sites

Supersonic
53 minutes ago, Blueray said:

er, our side who will sign hah ? [:p]

 

Wahahaa.....worry only at 8am 30 Jul

Skali laoma do fake anti-resign and show he got the numbers on 29 Jul

 

Link to post
Share on other sites

(edited)

https://www.channelnewsasia.com/news/singapore/singapore-malaysia-hold-ceremony-causeway-resumption-rts-link-12973304

Quote

He added that the construction will happen in two phases. The development and civil phase will take place from 2021 to end of 2024, while the commissioning and testing phase will take place from 2025 until the end of 2026. 

So delay 2 years. Initial plan 2024 complete, now 2026. Knn to that DrM, kah qiao kah qiao and do nothing constructive except for his crocked LJ bridge.

 

Actually it's better not to be linked to our MRT and be a stand alone system & operation.

Quote

Furthermore, the RTS Link will now be a standalone Light Rail Transit (LRT) system, instead of the leveraging the Thomson-East Coast Line MRT system, the statement said. The project's capacity remains unchanged at up to 10,000 passengers per hour per direction. 

Additionally, the depot for the project will be switched from the existing Thomson-East Coast Line Mandai depot to a new depot in Wadi Hana, Johor Bahru. 

 

Edited by Watwheels
  • Praise 3
Link to post
Share on other sites

1 hour ago, Watwheels said:

https://www.channelnewsasia.com/news/singapore/singapore-malaysia-hold-ceremony-causeway-resumption-rts-link-12973304

So delay 2 years. Initial plan 2024 complete, now 2026. Knn to that DrM, kah qiao kah qiao and do nothing constructive except for his crocked LJ bridge.

 

Actually it's better not to be linked to our MRT and be a stand alone system & operation.

 

Aiyo!  Finally...... after a long delay.

  • Praise 2
Link to post
Share on other sites

(edited)

very optimistic to have RTS ready by 2026 especially now with covid ... dont know when can start project

even after covid ... both countries will be busy with the clean up

Edited by Wt_know
  • Haha! 1
Link to post
Share on other sites

Supersonic
16 minutes ago, Wt_know said:

very optimistic to have RTS ready by 2026 especially now with covid ... dont know when can start project

even after covid ... both countries will be busy with the clean up

Surprising this project finally still go ahead? Msia side got money for this project?

  • Haha! 1
Link to post
Share on other sites

How can a light rail system serve 10k passengers per hour?

With a every 3 minute departure, that would mean 20 departures/arrivals in 1 hr. And means a train would need to carry 500 passengers per trip?
WIth a 2min departure, that would still mean 330+ passengers departing every 2 mins.

  • Praise 1
  • Haha! 1
Link to post
Share on other sites

4 hours ago, Lala81 said:

How can a light rail system serve 10k passengers per hour?

With a every 3 minute departure, that would mean 20 departures/arrivals in 1 hr. And means a train would need to carry 500 passengers per trip?
WIth a 2min departure, that would still mean 330+ passengers departing every 2 mins.

Every trip is a mass orgy. Terrible 

 

  • Haha! 1
Link to post
Share on other sites

4 hours ago, 13177 said:

Surprising this project finally still go ahead? Msia side got money for this project?

The payments from Goldman Sachs and Najib. And if they can catch that fatty, more $$ coming in. 

↡ Advertisement
  • Haha! 3
Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
 Share

×
×
  • Create New...