Jump to content

KL-Singapore High Speed Rail terminated after both countries fail to reach agreement on M'sia's proposed changes to project


RadX
 Share

Recommended Posts

2 minutes ago, Soya said:

LOL....i can onli say PH had better packaging

But open the box, inside same same smelly expired goods....

 

seriously, this legendary pix says it all ... it was then ... it is now ... it always be

spore <> msia no matter simi project ... simi open and transparent ... simi bilateral relationship 

the formula is the same ... 30 years ago ... now ... and 30 years later ... :D 

a.jpg

  • Praise 1
  • Haha! 4
Link to post
Share on other sites

7 minutes ago, Wt_know said:

you have given too much credits to PH

PH get into power for 2 years ... but i see no "paradigm shift" ... 

during election talk until pigs can fly ... oopps ... cannot say P-word ... hehe

look at Muhyiddin + gang ... before get into power ... talk until like no salary also must work ... do for rakyat, die for rakyat

and the other guy is Azmin + gang ... no power no talk ... 

then the laoma + anwar ... outside sibei friend like 1 undi 2 person wear ... after that ... flip table 

DAP also TCSS nia ... Amanah ... this one no power ... just follow 

before PH ... look at how DAP + PKR + PAS ... friend friend

then after breakout ... say PAS is "BAD" ... but before breakout ... friend until rub shoulder say want to save msia from jibby

before that every single oppo say umno is damaged to the core and no way to save ... now every party want to work with umno as long as can get into power 

You can't do paradigm shift in 2 years after 40 years of rot to core.

Of course during election talk until pigs can fly.  Marketing talk.

Those thing you mentioned is facts.  Look at LaoMa.  Wacked DAP like nobody business.

PAS previously was run by ppl split into Amanah.  These ppl are less religious.

Once PAS goes back to its religious root, of course have to break pact la.

DAP is in a precarious position.  Being the biggest party in parliament, but can't talk too much.

DAP has always been the vote bait for rural Malay.

LGE has to step down.  Let's see whether the new Party Secretary will be better.

Not forgetting DAP dropped to almost zero seats in the 80s or 90s.

  • Praise 2
Link to post
Share on other sites

Supercharged
17 hours ago, Thaiyotakamli said:

So they can give 'negotiated' procurement, maintenance and consultancy contracts to kakilang mah! 

Edited by Kklim
  • Praise 1
Link to post
Share on other sites

Supercharged
2 hours ago, Jellandross said:

Jib gor buay songz....

KUALA LUMPUR, Jan 4 — The Perikatan Nasional (PN) government wanted the ability to directly select vendors for the Kuala Lumpur-Singapore High Speed Rail (HSR) project without the involvement of Singapore, former prime minister Datuk Seri Najib Razak alleged today.

He claimed in a Facebook page that this was a departure from his initial vision for both countries to be responsible for the construction of the railway in order to prevent possible abuse or irregularity.

Najib: Perikatan wanted to dole out HSR jobs directly, cut Singapore out of selection process

https://malaysia.news.yahoo.com/najib-perikatan-wanted-dole-hsr-145257802.html

6b143e4387e40f482d011038cc484e94

 

A true friend of SG...He speaks the truth!! [laugh]...for once

  • Praise 1
  • Haha! 3
Link to post
Share on other sites

1 hour ago, inlinesix said:

You can't do paradigm shift in 2 years after 40 years of rot to core.

Of course during election talk until pigs can fly.  Marketing talk.

Those thing you mentioned is facts.  Look at LaoMa.  Wacked DAP like nobody business.

PAS previously was run by ppl split into Amanah.  These ppl are less religious.

Once PAS goes back to its religious root, of course have to break pact la.

DAP is in a precarious position.  Being the biggest party in parliament, but can't talk too much.

DAP has always been the vote bait for rural Malay.

LGE has to step down.  Let's see whether the new Party Secretary will be better.

Not forgetting DAP dropped to almost zero seats in the 80s or 90s.

40 yrs? That includes mahathir 24 yrs term as pm😁

Link to post
Share on other sites

1 hour ago, Kklim said:

So they can give 'negotiated' procurement, maintenance and consultancy contracts to kakilang mah! 

What's new?

Even for RTS project, abang openly say they will reserve contracts for bumi contractors (aka cronies)

So 'kakilang' excludes a lot of own ppl holding same IC. Let alone this pesky little red dot...

 

Link to post
Share on other sites

30 minutes ago, Mustank said:

Project cancelled. That’s not necessarily a bad thing :grin:

it’s the BEST decision EVER ...

wait 30 years later argue like the water 3 cents per thousand gallon become 3 cents per kilometer ... lol

Edited by Wt_know
  • Praise 2
  • Haha! 1
Link to post
Share on other sites

8 minutes ago, Wt_know said:

it’s the BEST decision EVER ...

wait 30 years later argue like the water 3 cents per thousand gallon become 3 cents per kilometer ... lol

Only Laoma do that.

Need to wait for him to tong tong chiang

  • Praise 1
Link to post
Share on other sites

1 hour ago, Mustank said:

Project cancelled. That’s not necessarily a bad thing :grin:

i second this!! take the money and do something for the SG

  • Haha! 1
Link to post
Share on other sites

5 hours ago, Freeder said:

HSR project is too mouth watering and Huats for the Bumis...

In No fxxking way  , they are gonna let this pass...
 

It'll probably be reborn in another shape or form

They ain't gonna form a back door gahmen just to let the golden goose walk away the front door...

 

Link to post
Share on other sites

10 minutes ago, Soya said:

It'll probably be reborn in another shape or form

They ain't gonna form a back door gahmen just to let the golden goose walk away the front door...

 

Malaysia is broke, so it looks like China is going to fund it (de facto contractor) and the Malaysian politicians and cronies will get their usual cut shifting papers around. 

 

Link to post
Share on other sites

Supercharged

Malaysia expects compensation for HSR project's termination to be below S$270 million: Mustapa Mohamed

“...we are confident that the compensation cost will be much lower than S$270 million. Anyway, the matter has not been finalised and will be discussed soon," Mustapa said.

https://www.channelnewsasia.com/news/asia/hsr-malaysia-compensation-below-270-million-mustapa-mohamed-13895790

Sounds like MY wants a discount on the compensation.  :XD:

Link to post
Share on other sites

Guest
This topic is now closed to further replies.
 Share

×
×
  • Create New...