#1

Posted 29 January 2017 - 10:19 PM

Christan
  • THREAD STARTER
  • Christan
    Supercharged
    The points of the user determines the rank. The higher the points, the higher the rank.
    Author Image
    The bar represents the rank and points of the user. The longer the bar, the higher the rank and points.
     
    Points:
    Points are accumulated from other users who Praise or Disliked this users' posts.
    7,425
      Joined: 28 September 2004
      Posts: 1,424
     

As above, anyone gone through this upgrading? What are things to take note of, especially for toilet/bathroom upgrading?

 

It's gonna be messy so need to cover the furniture, cabinet with plastic sheet they say. Where can I get the plastic sheet & the cost? Or other method for coverage?

 

And any protection for the flooring? Workers will be going in/out of the house so was thinking of laying canvas or cardboard.

 

Will also take this chance to redo bathroom fixtures & water heater which is already >10 yrs. Can the contractor assist? Maybe pay a token fee?

 

Seems must tahan for 10 days before work finished. [sweatdrop]  

 

 


Mustank, Uncle2, Carbon82, Freeder and Newbie26 praised this

#2

Posted 29 January 2017 - 10:24 PM

Kangadrool
  • Premium member
    Kangadrool
    2Fast2Furious
    The points of the user determines the rank. The higher the points, the higher the rank.
    Author Image
    The bar represents the rank and points of the user. The longer the bar, the higher the rank and points.
     
    Points:
    Points are accumulated from other users who Praise or Disliked this users' posts.
    41,827
      Joined: 03 July 2008
      Posts: 14,363
     

Can take the opportunity to ask workers to install accessories, water heater, etc for you. Tip them.


Mustank, Christan and Staff69 praised this

#3

Posted 29 January 2017 - 10:27 PM

Fcw75
  • Fcw75
    2Fast2Furious
    The points of the user determines the rank. The higher the points, the higher the rank.
    Author Image
    The bar represents the rank and points of the user. The longer the bar, the higher the rank and points.
     
    Points:
    Points are accumulated from other users who Praise or Disliked this users' posts.
    57,949
      Joined: 25 December 2002
      Posts: 19,726
     
The dust generated is scary.

My block was upgraded last year.
Doppel, Mustank and Christan praised this

#4

Posted 30 January 2017 - 01:26 AM

Jman888
  • Jman888
    Moderator
      Joined: 19 August 2002
      Posts: 53,464
     

Can take the opportunity to ask workers to install accessories, water heater, etc for you. Tip them.


No need to tips, just make sure when the contractor came to look at your unit before the job start, tell them what you want them to install, hanging bar, toilet paper hanger, heater, etc. can be done for free, but not fixture like cabinet.
Mustank and Christan praised this
骑白马的不一定是王 ,可能是唐僧;带翅膀的也不一定是天使,有时候是鸟人。

#5

Posted 30 January 2017 - 01:37 AM

Jman888
  • Jman888
    Moderator
      Joined: 19 August 2002
      Posts: 53,464
     

As above, anyone gone through this upgrading? What are things to take note of, especially for toilet/bathroom upgrading?

It's gonna be messy so need to cover the furniture, cabinet with plastic sheet they say. Where can I get the plastic sheet & the cost? Or other method for coverage?

And any protection for the flooring? Workers will be going in/out of the house so was thinking of laying canvas or cardboard.

Will also take this chance to redo bathroom fixtures & water heater which is already >10 yrs. Can the contractor assist? Maybe pay a token fee?

Seems must tahan for 10 days before work finished. [sweatdrop]



Those renovation plastic cover is quite cheap about $1.50 per sheet which I think you need at lease 10 sheet to cover most area. Also get those big clean wrap type that mover use for wraping furniture, wrap around all the furniture and electrical items, yes you won't be watching tv for that 10 days.

Use the plastic sheet to seal up most of the area, leave an access path for the worker to walk in and out but cover with cardboard or vinyl sheet.
Lala81, FourZero and Tonydeath praised this
骑白马的不一定是王 ,可能是唐僧;带翅膀的也不一定是天使,有时候是鸟人。

#6

Posted 30 January 2017 - 02:23 AM

Mustank
  • Mustank
    2Fast2Furious
    The points of the user determines the rank. The higher the points, the higher the rank.
    Author Image
    The bar represents the rank and points of the user. The longer the bar, the higher the rank and points.
     
    Points:
    Points are accumulated from other users who Praise or Disliked this users' posts.
    100,454
      Joined: 03 May 2007
      Posts: 38,380
     
Go get some big cardboard and put on the floor
Christan praised this

#7

Posted 30 January 2017 - 07:47 AM

UncleAtas
  • Premium member
    UncleAtas
    Turbocharged
    The points of the user determines the rank. The higher the points, the higher the rank.
    Author Image
    The bar represents the rank and points of the user. The longer the bar, the higher the rank and points.
     
    Points:
    Points are accumulated from other users who Praise or Disliked this users' posts.
    7,606
      Joined: 09 March 2009
      Posts: 1,234
     

If you need some corrugated paper, I have some spares from my renovations this year.

 

Drop me a PM if you need them.


Christan and Staff69 praised this
Refer to signature guidelines

#8

Posted 30 January 2017 - 09:19 AM

george78
  • george78
    1st Gear
    The points of the user determines the rank. The higher the points, the higher the rank.
    Author Image
    The bar represents the rank and points of the user. The longer the bar, the higher the rank and points.
     
    Points:
    Points are accumulated from other users who Praise or Disliked this users' posts.
    61
      Joined: 26 September 2016
      Posts: 47
     
First 3 days will be very dusty as they will hack away the toilet tiles. During the 10 days they will set up a temporary toilet in your kitchen for your use. You must have at least a family member around when they start work in your house and make sure all valuables are kept under lock. If your house waste pipe is hidden in your kitchen cabinet, they will take down your renovation fixture but they won't put it back for you. You need to put it back by yourself.
Christan praised this

#9

Posted 30 January 2017 - 09:53 AM

Lala81
  • Lala81
    2Fast2Furious
    The points of the user determines the rank. The higher the points, the higher the rank.
    Author Image
    The bar represents the rank and points of the user. The longer the bar, the higher the rank and points.
     
    Points:
    Points are accumulated from other users who Praise or Disliked this users' posts.
    109,183
      Joined: 26 May 2004
      Posts: 32,479
     

As above, anyone gone through this upgrading? What are things to take note of, especially for toilet/bathroom upgrading?

 

It's gonna be messy so need to cover the furniture, cabinet with plastic sheet they say. Where can I get the plastic sheet & the cost? Or other method for coverage?

 

And any protection for the flooring? Workers will be going in/out of the house so was thinking of laying canvas or cardboard.

 

Will also take this chance to redo bathroom fixtures & water heater which is already >10 yrs. Can the contractor assist? Maybe pay a token fee?

 

Seems must tahan for 10 days before work finished. [sweatdrop]  

 

Be proactive. Go ask the contractor or the foreman for enough plastic sheets.

Can choose what tiles you want.

They will lay cardboard paths i think.

You can speak to the foreman, usually they can assist you for some extra fees. Usually quite reasonable one.


Christan praised this

#10

Posted 30 January 2017 - 11:42 AM

Ysc3
  • Premium member
    Ysc3
    NOS-ed
    The points of the user determines the rank. The higher the points, the higher the rank.
    Author Image
    The bar represents the rank and points of the user. The longer the bar, the higher the rank and points.
     
    Points:
    Points are accumulated from other users who Praise or Disliked this users' posts.
    14,177
      Joined: 14 August 2003
      Posts: 6,592
     

First 3 days will be very dusty as they will hack away the toilet tiles. During the 10 days they will set up a temporary toilet in your kitchen for your use. You must have at least a family member around when they start work in your house and make sure all valuables are kept under lock. If your house waste pipe is hidden in your kitchen cabinet, they will take down your renovation fixture but they won't put it back for you. You need to put it back by yourself.

 

do they still hack ?? i thot all using overlays now ... faster and less dirty.

 

anyway my house renovated 5 years ago ... so will "miss" the HIP for my estate .... only opted for a new door and gate.

 

even only these two items, wonder when will it be done .... has been half a year since we did the poll.


Be proactive. Go ask the contractor or the foreman for enough plastic sheets.

Can choose what tiles you want.

They will lay cardboard paths i think.

You can speak to the foreman, usually they can assist you for some extra fees. Usually quite reasonable one.

 

dun have too much hopes on the tile selection ... we only had 2 choices here in tampines.


Christan praised this

#11

Posted 30 January 2017 - 11:46 AM

Lala81
  • Lala81
    2Fast2Furious
    The points of the user determines the rank. The higher the points, the higher the rank.
    Author Image
    The bar represents the rank and points of the user. The longer the bar, the higher the rank and points.
     
    Points:
    Points are accumulated from other users who Praise or Disliked this users' posts.
    109,183
      Joined: 26 May 2004
      Posts: 32,479
     

dun have too much hopes on the tile selection ... we only had 2 choices here in tampines.

 

?

you can buy your own tiles and ask them to lay one lor. But the added cost is yours to bear, no discount on the service. HDB only cares that waterproofing is done properly...

My mother put her own floor tiles into her toilet when it was done 3-4 years back. She did it cos she felt the HDB ones don't provide enough traction. The wall tiles are the HDB provided ones.


Edited by Lala81, 30 January 2017 - 11:50 AM.

Mustank praised this

#12

Posted 30 January 2017 - 11:51 AM

Lala81
  • Lala81
    2Fast2Furious
    The points of the user determines the rank. The higher the points, the higher the rank.
    Author Image
    The bar represents the rank and points of the user. The longer the bar, the higher the rank and points.
     
    Points:
    Points are accumulated from other users who Praise or Disliked this users' posts.
    109,183
      Joined: 26 May 2004
      Posts: 32,479
     

do they still hack ?? i thot all using overlays now ... faster and less dirty.

 

Err HDB is not doing for aesthetic reasons. They are doing it to renew the water proofing/sealants in the toilets.



#13

Posted 30 January 2017 - 11:54 AM

george78
  • george78
    1st Gear
    The points of the user determines the rank. The higher the points, the higher the rank.
    Author Image
    The bar represents the rank and points of the user. The longer the bar, the higher the rank and points.
     
    Points:
    Points are accumulated from other users who Praise or Disliked this users' posts.
    61
      Joined: 26 September 2016
      Posts: 47
     
Ysc3
If you opt out of the toilet upgrading, they still need to carry out a water test to verify your toilet is not leaking. However, the waste pipe in your kitchen and drainage pipe in your toilet still need to be replaced if they are the old cast iron type, so there will still be hacking and demolition works.
Usually within a year of voting for hip they will start the works unless less than 75% of the vote is gotten for it to proceed.
Lala81 praised this

#14

Posted 30 January 2017 - 11:58 AM

Gitanic
  • Premium member
    Gitanic
    Supercharged
    The points of the user determines the rank. The higher the points, the higher the rank.
    Author Image
    The bar represents the rank and points of the user. The longer the bar, the higher the rank and points.
     
    Points:
    Points are accumulated from other users who Praise or Disliked this users' posts.
    6,061
      Joined: 27 May 2011
      Posts: 2,794
     

I wonder it can be holistic as on pen is super

#15

Posted 30 January 2017 - 12:11 PM

Jman888
  • Jman888
    Moderator
      Joined: 19 August 2002
      Posts: 53,464
     

Ysc3
If you opt out of the toilet upgrading, they still need to carry out a water test to verify your toilet is not leaking. However, the waste pipe in your kitchen and drainage pipe in your toilet still need to be replaced if they are the old cast iron type, so there will still be hacking and demolition works.
Usually within a year of voting for hip they will start the works unless less than 75% of the vote is gotten for it to proceed.

all can be opt out including the kitchen pipes, my neighbor opt out.

i ask their contractor to take out my kitchen cabinet and put it back after replacing the pipe for $300, they did a good job without damaging my cabinet carpentry, look as if it was never removed before.
骑白马的不一定是王 ,可能是唐僧;带翅膀的也不一定是天使,有时候是鸟人。

#16

Posted 30 January 2017 - 12:20 PM

george78
  • george78
    1st Gear
    The points of the user determines the rank. The higher the points, the higher the rank.
    Author Image
    The bar represents the rank and points of the user. The longer the bar, the higher the rank and points.
     
    Points:
    Points are accumulated from other users who Praise or Disliked this users' posts.
    61
      Joined: 26 September 2016
      Posts: 47
     
Jman888
Yes, can opt out all items except waste pipe and drainage pipe if they are the old cast iron type.
You pay $300 for hip contractor to put your kitchen cabinet back is reasonable but some hip contractor can do it for $200.
Your neighbour cannot opt out unless they had changed the waste pipe and drainage pipe to the new pvc type during their renovation earlier.

#17

Posted 30 January 2017 - 12:26 PM

Jman888
  • Jman888
    Moderator
      Joined: 19 August 2002
      Posts: 53,464
     

Jman888
Yes, can opt out all items except waste pipe and drainage pipe if they are the old cast iron type.
You pay $300 for hip contractor to put your kitchen cabinet back is reasonable but some hip contractor can do it for $200.
Your neighbour cannot opt out unless they had changed the waste pipe and drainage pipe to the new pvc type during their renovation earlier.

nope i know neighbour and friends unde hip did not change the pipe before but opt out of the changes, the contractor just have to run the water pipe at the end of the project to see if the units have any leak.
骑白马的不一定是王 ,可能是唐僧;带翅膀的也不一定是天使,有时候是鸟人。

#18

Posted 30 January 2017 - 12:31 PM

george78
  • george78
    1st Gear
    The points of the user determines the rank. The higher the points, the higher the rank.
    Author Image
    The bar represents the rank and points of the user. The longer the bar, the higher the rank and points.
     
    Points:
    Points are accumulated from other users who Praise or Disliked this users' posts.
    61
      Joined: 26 September 2016
      Posts: 47
     
Strange. As I was in the hdb upgrading team a few years back in charge of a few precincts and know all the in and out, unless they have changed the rules. I was also doing the EASE programme for senior citizens. It was a good experience in hdb though I quit because of my DD who keeps creating trouble for me.

#19

Posted 30 January 2017 - 02:03 PM

Christan
  • THREAD STARTER
  • Christan
    Supercharged
    The points of the user determines the rank. The higher the points, the higher the rank.
    Author Image
    The bar represents the rank and points of the user. The longer the bar, the higher the rank and points.
     
    Points:
    Points are accumulated from other users who Praise or Disliked this users' posts.
    7,425
      Joined: 28 September 2004
      Posts: 1,424
     

Those renovation plastic cover is quite cheap about $1.50 per sheet which I think you need at lease 10 sheet to cover most area. Also get those big clean wrap type that mover use for wraping furniture, wrap around all the furniture and electrical items, yes you won't be watching tv for that 10 days.

Use the plastic sheet to seal up most of the area, leave an access path for the worker to walk in and out but cover with cardboard or vinyl sheet.

Thanks Jman888. I intend to get those plastic sheet from paint shops. Will shift items to 1 side of home for coverage rather than use one plastic sheet for each item
Carbon82, Uncle2, Newbie26 and Freeder praised this

#20

Posted 30 January 2017 - 02:09 PM

Ysc3
  • Premium member
    Ysc3
    NOS-ed
    The points of the user determines the rank. The higher the points, the higher the rank.
    Author Image
    The bar represents the rank and points of the user. The longer the bar, the higher the rank and points.
     
    Points:
    Points are accumulated from other users who Praise or Disliked this users' posts.
    14,177
      Joined: 14 August 2003
      Posts: 6,592
     

Ysc3
If you opt out of the toilet upgrading, they still need to carry out a water test to verify your toilet is not leaking. However, the waste pipe in your kitchen and drainage pipe in your toilet still need to be replaced if they are the old cast iron type, so there will still be hacking and demolition works.
Usually within a year of voting for hip they will start the works unless less than 75% of the vote is gotten for it to proceed.

 

i opted out of the toilets upgrading  coz just reno ... so they came to do water test  ... came in the morning and then flooded my toilets and then came back after 4 hours to check... i guess downstairs no problem so i am not required to do my toilets.