Search the Community
Showing results for tags 'SPing'.
-
FR Part 2 (The aftermath) Location: SILENT Pro Shop at Leng Kee Car Mart. Date: 28/07/2006 Time of arrival: 8.15pm Installation started: 9pm Installation ended: 11.30pm Attended by two installers: Desmond and Dan Material used: Estimated 6 7/10 sheets of Silent V-1 Areas applied: 2x front wheel arc cum fender and 2x front door Car:
-
Part 1 (Covers cost, customer service, workmanship, workshop and resting area) Location: SILENT Pro Shop at Leng Kee Car Mart. Date: 28/07/2006 Time of arrival: 8.15pm Installation started: 9pm Installation ended: 11.30pm Attended by two installers: Desmond and Dan Material used: Estimated 6 7/10 sheets of Silent V-1 Areas applied: 2x front wheel arc cum fender and 2x front door Car: