Zyrofillica 1st Gear February 25, 2010 Share February 25, 2010 place a swim suit calender at your desk. curves always helps me divert my attention away from cubic pieces of concrete! ↡ Advertisement Link to post Share on other sites More sharing options...
Kingcopa 1st Gear February 25, 2010 Share February 25, 2010 (edited) Test the pile to see if it can take its design load. Simple as that. Edited February 25, 2010 by Kingcopa Link to post Share on other sites More sharing options...
Diesel 1st Gear February 25, 2010 Share February 25, 2010 Is a load test for the piles driven into the soil. at the centre bottom of that stack is a hydraulic jacking device mounted on top of a pile and readings taken of the devices to measure settlement of the pile in order to determine the datas needed to strengthent the foundations. Link to post Share on other sites More sharing options...
TangoElite 6th Gear February 26, 2010 Share February 26, 2010 (edited) new question: noticed a few floating barges at Marina Bay Sands site where are the barges going to after works are completed given that the singapore river is sealed off at marina barrage?? are they going to: 1.) just destroy them and sell for scrap? (most likely but what a waste) 2.) break them into pieces and transport on dry land and assemble back again (is that even possible?) 3.) use super crane to hoist over the barrage (unlikely, too costly) 4.) convert to tourist boat and fetch tourist around the bay area. barges are in the bottom foreground: Edited February 26, 2010 by TangoElite Link to post Share on other sites More sharing options...
Joseph22 Turbocharged February 26, 2010 Share February 26, 2010 new question: noticed a few floating barges at Marina Bay Sands site where are the barges going to go after works are completed given that the singapore river is sealed off at marina barrage?? are they going to: 1.) just destroy them and sell for scrap? (most likely but what a waste) 2.) break them into pieces and transport on dry land and assemble back again (is that even possible?) 3.) use super crane to hoist over the barrage (unlikely, too costly) 4.) convert to tourist boat and fetch tourist around the bay area. barges are in the bottom foreground: You dont know meh?? they are transformer. They will Transform and roll out when the Building is done Anyway yeah its a good question. Link to post Share on other sites More sharing options...
TangoElite 6th Gear February 26, 2010 Share February 26, 2010 You dont know meh?? they are transformer. They will Transform and roll out when the Building is done Anyway yeah its a good question. DECEPTICONS!!! narbey this one not my clique, so i dont know Link to post Share on other sites More sharing options...
Dsmnd Neutral Newbie February 26, 2010 Share February 26, 2010 sounds logical...but before the even bring the cubes into the site.....i have seen them drilled and take soil samples. i guess they would already know abt the soil conditions before the actual design stage....anyway i also guessing soil testing will definately need t be done for any site..because no point for piling if it's marine clay at the bottom..need to know for sure the soil condition can be compacted and take the design load. Link to post Share on other sites More sharing options...
Ngck 3rd Gear February 26, 2010 Share February 26, 2010 How about those fix crane. how to they stack so high in the first place? must have something higher to lift up the crane right? Link to post Share on other sites More sharing options...
Freestylers09 5th Gear February 26, 2010 Share February 26, 2010 wah suit ur name sia...issit from ur office view? Link to post Share on other sites More sharing options...
TangoElite 6th Gear February 26, 2010 Share February 26, 2010 wah suit ur name sia...issit from ur office view? no lah, isnt googled the pic Link to post Share on other sites More sharing options...
Bystander50 5th Gear February 26, 2010 Share February 26, 2010 What's the difference between bored piling and those hammering the steel beams into the ground? It's possible that hammering those steel beams into the ground compacts the soil underneath. But for bored piling, I've seen them drilling a hole into the ground and pouring concrete in after putting in those reinforcement bars. This does not compact the soil right? What's the difference when it comes to supporting the structure? Link to post Share on other sites More sharing options...
Theobserver 2nd Gear February 26, 2010 Share February 26, 2010 Actually, purpose of having piles, whether steel or bored piles, is not to strengthen the soil. Piles are used to transfer the load from the building deep down into the hard soil layer, thereby ensuring the building do not settle excessively. The hard soil layer is the original ground millions of years ago and through the years, foreign soil are deposited onto this original soil. By this current time, the original soil is more than 40 metres below the ground level. The piles therefore could be as long as 70 metres. Hope I can be of help. What's the difference between bored piling and those hammering the steel beams into the ground? It's possible that hammering those steel beams into the ground compacts the soil underneath. But for bored piling, I've seen them drilling a hole into the ground and pouring concrete in after putting in those reinforcement bars. This does not compact the soil right? What's the difference when it comes to supporting the structure? Link to post Share on other sites More sharing options...
Speeddemon Neutral Newbie February 26, 2010 Share February 26, 2010 (edited) Test the pile to see if it can take its design load. Simple as that. This answer best.....short, sweet, sharp and correct Are you also from the construction industry? Edited February 26, 2010 by Speeddemon Link to post Share on other sites More sharing options...
Karoon Turbocharged February 26, 2010 Share February 26, 2010 interesting fact: international plaza is constructed without any piles. true fact. Link to post Share on other sites More sharing options...
Modykoh 1st Gear February 26, 2010 Share February 26, 2010 i wonder what is the weight of 1 cube the size is usually 1m x 1m..so the vol x the specific desity u get the weight. some cube is 1.5m x1.5m Link to post Share on other sites More sharing options...
Fishy 4th Gear February 26, 2010 Share February 26, 2010 which floor of ORQ are you located? I think its at least 25? Link to post Share on other sites More sharing options...
Speeddemon Neutral Newbie February 26, 2010 Share February 26, 2010 International Plaza? The one at Tanjong Pagar MRT? No piles.....really? What did they use? Link to post Share on other sites More sharing options...
Anakusop Clutched February 26, 2010 Share February 26, 2010 watch discovery channel every thursday... confirm most of ur construction questions will be answered.... ↡ Advertisement Link to post Share on other sites More sharing options...
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In NowRelated Discussions
Related Discussions
Math Question
Math Question
Govt wants to share construction manpower disruption burdern between the contractors, developers, and buyers
Govt wants to share construction manpower disruption burdern between the contractors, developers, and buyers
Question on Transfer of Car Ownership
Question on Transfer of Car Ownership
Question for Car Servicing
Question for Car Servicing
Silly question about season parking
Silly question about season parking
COE renewal question
COE renewal question
Question of polyclinics
Question of polyclinics
Noob questions on property
Noob questions on property