Pinobii Hypersonic July 11, 2016 Share July 11, 2016 Just one thought, what should be the cut off for disclosure to the public Maybe to L t a and S M R T, this wasnt even in their consideration/protocol ↡ Advertisement 2 Link to post Share on other sites More sharing options...
13177 Hypersonic July 11, 2016 Share July 11, 2016 Correct wait for KBW and gang to respond.. Must be patient, they are crafting some excuses and usually takes weeks so that's why still so silent. I am only curious if the public should get ready some samurai swords for them Hara-kiri-kanan. You are right, they need to think of all sort of excuse to counterstrike the public. 1 Link to post Share on other sites More sharing options...
Weez911 Supersonic July 11, 2016 Share July 11, 2016 Just one thought, what should be the cut off for disclosure to the public Maybe to L t a and S M R T, this wasnt even in their consideration/protocol I'm sure LTA considered the disclosure because they eventually disclosed some information after Factwire did In terms of materiality of information for disclosure, they would have deemed it important enough because they disclosed the information after all That brought my first question above on why not earlier.... I will leave that to Khaw 1 Link to post Share on other sites More sharing options...
inlinesix Hypersonic July 11, 2016 Share July 11, 2016 Engineering constraint. Lighter chassis at the same strength will result in more cost for the same durability. I believe the hairline crack issue is the result. It is Financial constraint lah. Link to post Share on other sites More sharing options...
Joseph22 Turbocharged July 11, 2016 Share July 11, 2016 (edited) It is Financial constraint lah.Yes your are right. Thanks for correction should be Financial constraint. And sometime the reduction amount doesn't justify the increase in price. No point building mrt with aeroplane material. Edited July 11, 2016 by Joseph22 Link to post Share on other sites More sharing options...
inlinesix Hypersonic July 11, 2016 Share July 11, 2016 I'm sure LTA considered the disclosure because they eventually disclosed some information after Factwire did In terms of materiality of information for disclosure, they would have deemed it important enough because they disclosed the information after all That brought my first question above on why not earlier.... I will leave that to Khaw LTA does not think that it is important to disclose. That's why no disclosure. Only when the new break, they disclose some fact. We are peasants. No need to know. Yes your are right. Thanks for correction should be Financial constraint. And sometime the reduction amount doesn't justify the increase in price. No point building mrt with aeroplane material. Why no point to build MRT with aeroplane material? It will help to lighten the train to take more passenger load. 1 Link to post Share on other sites More sharing options...
Joseph22 Turbocharged July 11, 2016 Share July 11, 2016 (edited) LTA does not think that it is important to disclose. That's why no disclosure. Only when the new break, they disclose some fact. We are peasants. No need to know. Why no point to build MRT with aeroplane material? It will help to lighten the train to take more passenger load. Do u kill a chicken with parang? Easy for u to say now. If they really buy something so expensive... There will be more complain. Edited July 11, 2016 by Joseph22 Link to post Share on other sites More sharing options...
Kangadrool Supersonic July 11, 2016 Share July 11, 2016 Still searching for the templates in the computer file folders... Just one thought, what should be the cut off for disclosure to the publicMaybe to L t a and S M R T, this wasnt even in their consideration/protocol 1 Link to post Share on other sites More sharing options...
Mustank Hypersonic July 11, 2016 Share July 11, 2016 https://sg.news.yahoo.com/comment-smrt-train-saga-exposes-cracks-in-013927667.html Hoot of the day 3 Link to post Share on other sites More sharing options...
Ahbengdriver 6th Gear July 11, 2016 Share July 11, 2016 Last tum, AIMgate, our KBW said no one breached any Town Council Act. Lets see this tum whats the story. Could be that SMRT/LTA/MOT did not breach any act or something like that. Not I say one, not I say one. I say say only for someone. Not I say one. Link to post Share on other sites More sharing options...
inlinesix Hypersonic July 11, 2016 Share July 11, 2016 Do u kill a chicken with parang? Easy for u to say now. If they really buy something so expensive... There will be more complain. That's why keyboard warrior mah. I don't mind paying more for less problem. Link to post Share on other sites More sharing options...
Joseph22 Turbocharged July 11, 2016 Share July 11, 2016 That's why keyboard warrior mah. I don't mind paying more for less problem. It won't be no problem. Simply because reliability test wasn't conduct enough when they use a "lighter" material. Data can show that it match existing... But actual test might defer.... I know of accident that happen when better lighter material are use. But when test started.... After X times the whole thing give way. End up on paper very good, but actual usage proof otherwise. Btw, this suppose to be joint venture by the jap and China company right?? Why the jap company like no impact to them. Link to post Share on other sites More sharing options...
inlinesix Hypersonic July 11, 2016 Share July 11, 2016 It won't be no problem. Simply because reliability test wasn't conduct enough when they use a "lighter" material. Data can show that it match existing... But actual test might defer.... I know of accident that happen when better lighter material are use. But when test started.... After X times the whole thing give way. End up on paper very good, but actual usage proof otherwise. Btw, this suppose to be joint venture by the jap and China company right?? Why the jap company like no impact to them. There are lighter material with the same amount of strength, right? Link to post Share on other sites More sharing options...
Joseph22 Turbocharged July 11, 2016 Share July 11, 2016 There are lighter material with the same amount of strength, right?There are but result defer greatly from reality... The reliability test can only be conducted over times spend on running. Link to post Share on other sites More sharing options...
Kangadrool Supersonic July 11, 2016 Share July 11, 2016 hoothoothosay... https://sg.news.yahoo.com/comment-smrt-train-saga-exposes-cracks-in-013927667.htmlHoot of the day 2 Link to post Share on other sites More sharing options...
Baal Supersonic July 11, 2016 Share July 11, 2016 I would reckon its like the now divorced Hero Honda motocycles in India. When people saw that its a joint venture, expectations and perceived onus of accountability & quality are managed accordingly. 3 Link to post Share on other sites More sharing options...
Mustank Hypersonic July 11, 2016 Share July 11, 2016 hoothoothosay...Ownself hoot ownself Link to post Share on other sites More sharing options...
Wt_know Supersonic July 11, 2016 Share July 11, 2016 (edited) stir ar stir ... local journalist are meeks and no dare to "pecah lobang"? SMRT train saga exposes cracks in outdated media policy The embarrassment is not just for the government. The MRT story exposed the local media’s inability and/or unwillingness to investigate government scandals and thus help play its rightful role in society. Investigative journalism is a lost art here. Our newspapers are filled with press-release journalism, making them dull and at most times unreadable. Edited July 11, 2016 by Wt_know ↡ Advertisement 1 Link to post Share on other sites More sharing options...
Recommended Posts
Related Discussions
Related Discussions
Consolidated Info on MRT/LRT Maintenance & Breakdown Part II
Consolidated Info on MRT/LRT Maintenance & Breakdown Part II
New MRT trains arrive in S'pore to replace 1987 fleet. They're designed in Germany, made in China.
New MRT trains arrive in S'pore to replace 1987 fleet. They're designed in Germany, made in China.
Johor Bahru-Singapore RTS link
Johor Bahru-Singapore RTS link
Public Urination in MRT Stations
Public Urination in MRT Stations
Public transport fare hike: Adults to pay 10 to 11 cents more per journey from Dec 23
Public transport fare hike: Adults to pay 10 to 11 cents more per journey from Dec 23
New stations, line extensions planned for Singapore’s MRT
New stations, line extensions planned for Singapore’s MRT
Penang fight scene garners 8mil views
Penang fight scene garners 8mil views