Jump to content

ALL consolidated SMRT/NEL/KT.. simisai BREAKDOWNS here!


New_Atlantis
 Share

Recommended Posts

Turbocharged

"Preliminary investigations found a faulty train which could have caused the power to trip; arcing was observed on the underside of this train. The power surge caused the protective relays across the entire North South East West Lines network to be activated, leading to a shut-down of power across the two lines. We will continue to comb through the system through the night to see if there could be other faulty trains or other causes."

http://www.channelnewsasia.com/news/singapore/faulty-train-could-have/1967418.html

 

Trains overworked due to higher demand... all points back to the increase in population without the corresponding increase in infrastructure.

↡ Advertisement
  • Praise 3
Link to post
Share on other sites

Turbocharged
(edited)

 

Kee chiu must be feeling the heat as well....

 

Many of the comments on LTY and SMRT's page are about how our paper generals don't have enough experience and should not be parachuted into important positions.....

 

no choice hes having a massive erection soon.. have to marikita all d way till sept

Edited by Duckduck
Link to post
Share on other sites

Twincharged

 

Trains overworked due to higher demand... all points back to the increase in population without the corresponding increase in infrastructure.

 

The system is too far screwed to be redeemed, IMHO, no matter what is done. Unless there is a massive investment of infrastructure, and a long period of shutdown of the system to phase in the new infrastructure.

 

The long period of running without proper maintenance has taken its toll and now the whole thing is to be messed up to have any hope of piecemeal efforts having any significant effect.

 

I pity those engineers, technicians in SMRT have to cope with this.

  • Praise 2
Link to post
Share on other sites

Turbocharged

Suddenly all the money I spent on owning car look very worthwhile now...it will be some time before singaporeans are convinced to give up their cars..

 

Hmm..like I also say, if only they commit the same amount of ministerial and governmental resources like they did when they investigated aljunied town council, there will be no such faux pas embarassing issues on our train line [rifle] ..

  • Praise 6
Link to post
Share on other sites

Turbocharged

 

ERP is military-spec.

MRT is PRC-spec.

Nope, mrt breakdown just say sorry, beh tio pok

 

Cash cow ERP breakdown, sorry no cure, sure tio pok....

Link to post
Share on other sites

Hey guys! Check out see tuck yew Facebook

The comments dam funny!!! [laugh]

 

https://www.facebook.com/luituckyew/posts/1137046296325814

 

The people are really really angry.

Think the public holiday must delay longer.

Have tried to build up the support with all the goodies announced...all futile efforts.

 

At least aound 500k people really angry.

NB! Took 97 from Shenton Way with CO, driver was an old uncle in his late 50's. Wah kor, drove like a P-plater . . . journey took an hour slightly more. Reached JE interchange and walked all the way to Bukit Batok mrt, drove back to JEMS and picked up CO. Sssssssst!

 

That's at least 20mins walk :beaten:

  • Praise 2
Link to post
Share on other sites

Twincharged
(edited)

The newest batch of train which will be in service in year 2016 is even heavier then the current new one may cause even more problem. Don't know why smrt order train that the weight keep increase. Couldn't they order train that would at least maintain the weight? Like the newest batch is a lot heavier then the older one by 1/4 when full load. That could put a lot more stress to the track.

 

Imagine they detect power fault due to faulty train. Is it really 100% because of fault train? Could it be the weight of the train combine with too many people in the train that cause the train to sag down to the level that may be dangerously low and touch the power line that causes power surge and trip the whole ns Ew line?

Edited by Yewheng
Link to post
Share on other sites

Twincharged

post-14834-0-71238500-1436305046_thumb.png

 

For those taking train to work later, try to go out eariler then usual. Train will run at slower speed and also at less frequency.

  • Praise 1
Link to post
Share on other sites

Hey guys! Check out see tuck yew Facebook

The comments dam funny!!! [laugh]

 

https://www.facebook.com/luituckyew/posts/1137046296325814

Hi, thanks for sharing, didnt know the extend of the issue until after reading the comments

 

Pity the folks who were denied of a secure public transport system

 

Been hearing sorry too many times, can't they just fixed this issues even if it means doing partial closure of tracks/stations to invest in thr maintenance or change of system?

 

I think the issues are serious enough and too frequent, people can understand the temp. Inconvenience of tracks/station closure for repairs if this temp. Inconvenience can solve the long standing issues once n for all.

  • Praise 1
Link to post
Share on other sites

Turbocharged
(edited)

those taking NS line , there will be no trains from 11am to 4 pm (Wed 8 Jul ) ....

 

 

CJVztYkUYAAX0Tv.png

Edited by Camrysfa
Link to post
Share on other sites

Hi, thanks for sharing, didnt know the extend of the issue until after reading the comments

 

Pity the folks who were denied of a secure public transport system

 

Been hearing sorry too many times, can't they just fixed this issues even if it means doing partial closure of tracks/stations to invest in thr maintenance or change of system?

 

I think the issues are serious enough and too frequent, people can understand the temp. Inconvenience of tracks/station closure for repairs if this temp. Inconvenience can solve the long standing issues once n for all.

 

i have bicycle

  • Praise 2
  • Haha! 1
Link to post
Share on other sites

 

i have bicycle

Hee hee.....morning morning.....u r an early bird, can catch the worm.....still need bicycle meh? ;)

 

:yeah-im-not-drunk:

  • Praise 1
Link to post
Share on other sites

Cannot imagine how the " whacking " will intensify down the line !

Perhaps will start off by saying cutting all smrt dividend and funnel to remov works...cutting CEO salary to funnel passenger lost...cutting ministar pay to funnel economic and social break down

Link to post
Share on other sites

first step is they should de-list smrt, then they can let go of the burden of delivering profits to the board n shareholders

 

Without this, they will always be trying to think of ways to solve the issues by not affecting top line

 

Not a bad thing but the problem has become serious enough that they should fix the issues at one go n p&l should not be the reason causing the repetitive breakdowns

  • Praise 2
Link to post
Share on other sites

(edited)

Hee hee.....morning morning.....u r an early bird, can catch the worm.....still need bicycle meh? ;)

 

:yeah-im-not-drunk:

 

hahaha I hardly sleep over 5 hrs ..... very cham

 

 

i have 2 ka

 

 

honto des ka ....... hahaha :secret-laugh:

________________________________________________________________________________

 

All these shit happen when you pay tthe CEO too high a salary for no reason ........ see see

Edited by Angcheek
↡ Advertisement
  • Praise 2
  • Haha! 1
Link to post
Share on other sites

Guest
This topic is now closed to further replies.
 Share

×
×
  • Create New...